Directional Drilling Projects
2012-6-15 · Diameter of pipeline installed: multi-duct – 4 x 160mm diameter HDPE ducts (installed in two parts) Length of installations: 168m and 164m Obstruction traversed: Berg River – approximately 140m wide and 9m deep (approximate measurement taken along the bore path) Client: Local power utility Main contractor: Racec Electrification